Produce your own solar energy, locally.

With the installation of professional solar panels on your company's roof, you produce local photovoltaic electricity, consumed through self-consumption. The surplus is resold at a regulated rate via purchase obligation, guaranteeing sustainable income.

Make the sun an asset for your hotel: a profitable investment for companies wishing to achieve savings, gain environmental visibility, and enhance their sustainable commitment to their customers.

70-90%

Self-consumed production

10-30%

Savings on bills

6-10 ans

Payback period

A solar sizing study for optimized production and a controlled project

Before any professional solar panel installation, Heraklio conducts a photovoltaic sizing study to adapt the power in kWp to your building, your activity and your energy objectives. By analyzing your electricity consumption profile, we build a reliable and profitable solar project.This study includes:

  • An estimate of your solar production in kWh, according to the orientation of your roof or ground space
  • The achievable self-consumption rate, to reduce your energy bill
  • The share of surplus injected into the grid, valuable via purchase obligation at a regulated rate
  • A return on investment calculation integrating aids, premiums, and subsidies

A professional solar solution designed to avoid under-sizing and optimize your energy savings from commissioning.

Man installing solar panels

A network of RGE-accredited partner installers

At Heraklio, each professional solar panel installation is carried out by an RGE-accredited partner installer (Recognized Environmental Guarantor). All our experts are QualiPV certified, an essential qualification to access self-consumption aid schemes and benefit from energy premiums.This certification guarantees:

  • Compliance with safety and performance standards
  • Quality implementation on your roof or ground installation
  • Eligibility for the self-consumption premium and the electricity surplus purchase rate under the purchase obligation (EDF OA)

Our partner installers are rigorously selected for their expertise, technical knowledge and ability to manage large-scale photovoltaic projects for companies. They have ten-year warranty covering the work performed, and are able to operate throughout France, on all types of professional buildings.

A turnkey service: Heraklio manages your solar project from A to Z

With Heraklio, you benefit from a complete photovoltaic solution, specially designed for companies wishing to produce their own solar energy without worrying about technical or administrative procedures.We handle:

  • The technical study and sizing of the installation
  • All regulatory procedures (town hall, Enedis, Consuel…)
  • The installation of solar panels on roof or ground
  • The commissioning of your photovoltaic plant

Our mission: to help you fully benefit from the economic, ecological and tax advantages linked to the energy transition, by maximizing your savings, your income and the environmental enhancement of your project.

Solar panels on commercial roof

Your energy future starts here

Contact us for a free consultation today!

Our turnkey approach

Benefit from our technical expertise combined with comprehensive management of all essential steps for your project's success.

1. Get a free sizing study

By simply providing us with your meter's PDL number, we are able to indicate the installed power best suited to your building, and provide you with a projection of the energy produced, consumed, as well as expected savings.

2. We validate the project feasibility

We organize a technical pre-visit with our RGE partner and conduct a structural study to confirm that your establishment is compatible with solar panel installation.

3. We handle all administrative procedures

Once the best offer for you is identified, we launch the essential administrative procedures for the successful completion of your project:
- Prior declaration at the town hall
- Connection request to the local network provider

4. Enjoy quick installation and immediate savings

The installation of your solar solution generally takes one to two weeks and does not impact your activity in any way. As soon as our RGE partner leaves, you start consuming the solar energy produced, and therefore save on your bill.

General information

To help you navigate the solar world, we answer your main questions. Contact us directly for additional information.

Production capacity, self-consumption, self-production: how to get your head around it all?

  • Production capacity (kWh/year): amount of electrical energy produced by the photovoltaic installation
  • Self-consumption (%): share of solar energy produced that is consumed to meet the building's needs
  • Self-production (%): share of the building's electrical consumption coming from the solar installation

What are the mandatory procedures for a solar panel installation?

Any professional solar panel installation must comply with a set of administrative and regulatory procedures. These steps are essential to guarantee the safety of your photovoltaic plant, ensure its commissioning according to regulations and allow you to benefit from available financial aid.Heraklio takes care of all these obligations on your behalf, to guarantee you a compliant, secure and profitable solar project.The main procedures include:

  • A structural study of your roof or ground space, to ensure technical feasibility and installation durability
  • The prior declaration at the town hall, mandatory before any photovoltaic work
  • The connection request to Enedis, to integrate your installation into the electrical grid
  • Obtaining Consuel, certifying the electrical compliance of your installation according to current standards

These procedures are essential for your project to be eligible for purchase obligation (via EDF OA), the self-consumption premium, as well as public subsidies or regional ones. As an actor committed to the energy transition, Heraklio simplifies the entire process to offer you a smooth and risk-free experience.Thanks to our photovoltaic expertise and our mastery of administrative procedures, you save time, gain peace of mind and accelerate the profitability of your solar installation.

What financial assistance can I benefit from for my project?

Investment in a professional photovoltaic installation is now supported by several financial aid schemes set up by the State. At Heraklio, we support you to maximize your profitability by automatically activating the solar aids you are entitled to.Two main mechanisms are available for companies wishing to produce their own solar electricity:

1. The self-consumption premium

Awarded for any photovoltaic solar panel installation in self-consumption with surplus injection, this premium is paid by EDF OA, one year after your plant is commissioned.

It is calculated based on the installed power (expressed in kWp) and directly integrated into your overall energy income. This aid reduces the initial purchase price of the installation and accelerates your return on investment.

2. Purchase obligation – EDF OA

Under the purchase obligation, unconsumed photovoltaic electricity is injected into the grid and purchased by EDF at a regulated rate, guaranteed for 20 years. This surplus purchase price depends on your installation's power, and constitutes a source of stable and predictable income for your company.

By combining optimized self-consumption and surplus sales, you fully capitalize on your solar production and improve the overall profitability of your project.

Why give access to my smart meter?

By providing us with your meter's unique ID, we access the history of your electricity consumption and can thus precisely size your photovoltaic panel installation. This allows us to:

  • Define the power in kWp best suited to your roof or available space
  • Avoid under-sizing or over-sizing of your solar plant
  • Optimize your self-consumption rate and the amount of solar electricity injected into the grid
  • Calculate a reliable return on investment, integrating aids, premiums and income from surplus

This step is essential to guarantee a high-performance photovoltaic solution, profitable and perfectly adapted to your company's energy needs.

Who are your partner installers?

All of our partners are RGE QualiPV certified, a qualification obtained after skills audit and subject to ten-year warranty.

This qualification is mandatory to benefit from the EDF OA scheme, allowing you to resell your electricity surplus and receive the self-consumption premium.

Any other questions ?

Your energy future starts here.

Contact us for a free consultation today!

Heraklio utilise des cookies pour améliorer votre expérience et analyser les performances du site.